SPARKYSTUDY NOTES

Free notes

Proving dead: three tests, or ten, and never trusting someone else's isolationThree phase. How many tests to prove it dead?

Free from the notes: the section word for word as members see it, and a PDF to keep.

The notes

Exactly as they are on the site.

Download these notesPDF · free to keep

Proving dead: three tests, or ten

Work from the least dangerous conductor first. Your CPC is the least dangerous, so that's where you start, and you move one probe at a time — it's quicker and it keeps a hand still.

3Single phase
1 · CPC to neutral
2 · CPC to line
3 · line to neutral
10Three phase
Four to earth, three to neutral, three between lines
#Three-phase sequence
1–4CPC to neutral · CPC to L1 · CPC to L2 · CPC to L3
5–7Neutral to L1 · neutral to L2 · neutral to L3
8–10L1 to L2 · L1 to L3 · L2 to L3
The last three are the most dangerous, which is exactly why they're last. Neutral is less dangerous than line; line to line is the worst case. Work up the list, not down it.

Where the probes go — and it differs by system

SystemWhere you testWhy
Single phaseLoad (busbar) side of the main switch — usually the bottom on a consumer unitThe busbar links all the breakers and RCDs, so the load side of the main switch proves every circuit
Three phaseLoad (busbar) side of the main switch, or the busbar chamberWhich end the supply comes in varies between boards: find the busbar side on the board in front of you
A busbar chamber is what you'll meet on larger three-phase installations — big copper bars with a brown, black and grey cable landing on them. That's a perfectly valid place to prove dead.
Does the lead colour matter? Not on safe isolation, and not on dead testing. On live testing, line your colours up with the conductors you're on. On phase rotation the order genuinely matters, and that's covered with live testing.

Electrician's Guide · Section 7 GN3 · proving dead

Never trust someone else's isolation

✋A colleague or an employer tells you a circuit is isolated and ready for you. You check it yourself. Every time. It doesn't matter who they are. You're the one who'll be working on it, so you're the one at risk.

And if anyone gets annoyed that you want to verify it, that tells you what you need to know about how seriously they take your safety. It runs the other way too — if you tell somebody you've isolated something, you should expect them to check.

EAWR · the duty sits with you

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside