SPARKYSTUDY NOTES

Free notes

Ze: the external impedance, and what you are not allowed to touchCan you put your leads in the meter tails?

Free from the notes: the section word for word as members see it, and a PDF to keep.

The notes

Exactly as they are on the site.

Download these notesPDF · free to keep

Ze is everything outside your installation — the supply transformer, the service cable and the earth return path. You are testing the DNO's supply, not your own work. Guidance Note 3 · p.84.

✋Ze is a LIVE test. You disconnect the earthing conductor, but you are measuring across the incoming (supply) terminals of the main switch — usually the top on a single-phase consumer unit; check the board in front of you, on the incoming supply. This one catches people out.

Which raises the question of where you are allowed to put your leads:

PointMay you touch it?
DNO cutout / service headNo — illegal
The kWh meter and its tailsNo — the DNO's
The electricity company's isolatorYou may lock off there, but not disconnect inside it
Incoming terminals of your main switch (usually the top)Yes — the closest legal point to the incoming tails
Incoming terminals of a separate isolator, if fittedYes — you can take the measurement there instead
No parallel paths for Ze. You disconnect the earthing conductor at the MET. In principle you could instead remove every cpc in the board — nobody does, because one conductor is quicker than twenty.
✋While that earthing conductor is out, the installation is not protected. Metal casings and extraneous conductive parts — gas and water pipes — have lost their connection to earth. If a fault developed on one while you were brushing past it, you would be in serious trouble. Reconnect it the moment the test is done, before you move on to anything else.

Say the reading comes back at Ze = 1.09 Ω on a TN-C-S supply, which is very high for that system type — which is exactly the point of measuring it rather than assuming it.

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside