SPARKYSTUDY NOTES

Free notes

Why design work sits in a periodic inspectionWhy check maximum demand on a periodic?

Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.

From Sparky’s full video lesson. Members get the whole lesson on every notes page.

The notes

Exactly as they are on the site.

Download these notesPDF · free to keep

Because an inspector has to be able to check the designer's work. Three things on a periodic can only be judged against what the circuit was designed to do:

Is the cable still the right size for the load?
Does Zs still come in under the permitted maximum?
Does the maximum demand of the whole installation still sit inside the supply fuse?
✋The last one almost never gets rechecked. Circuits get added over the years — an extension, an outhouse, a shower — and nobody recalculates whether the DNO's fuse still covers it. That calculation belongs on the periodic.

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside