BS 7671 only requires a test at one times (1×I∆n), with the instrument set to Type AC, and the result recorded on the Schedule of Test Results. Guidance Note 3 sets out two lists beside it.
| Test | Expected result | Status |
|---|---|---|
| Half times | Should not trip | Recommended · Table 2.18(a) |
| One times | Trip within 300 ms (non-delayed) · 500 ms (S-type) | Recommended · Table 2.18(a) · the one BS 7671 requires |
| Five times | Within 40 ms (non-delayed, 30 mA or less) · 150 ms (S-type) | Optional · Table 2.18(b) |
The one-times test is run at 0° and 180°, and the longer of the two times is recorded — in column 28 of the Schedule of Test Results. Older non-delay devices to BS 4293 or BS 7288:1990 have a 200 ms limit at one times.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing