SPARKYSTUDY NOTES

Free notes

When to bond, and when not toWater comes in as plastic. Do you bond it?

Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.

From Sparky’s full video lesson. Members get the whole lesson on every notes page.

The notes

Exactly as they are on the site.

Download these notesPDF · free to keep

An electrician needs to know when to bond and, just as importantly, when not to. Ask one simple question:

"Is it a conductive part that comes out of the ground?"
Yes → it's extraneous, so bond it. No (plastic, or never touches the ground) → don't.
TN-Stransformerstar pointsupply earth (sheath)C/UMETloadCPCgas meterstopcockgaswater (plastic)branch goesback into groundno bond neededplastic in → copper inside: no bond at the entrycopper back into the ground → bond it
A plastic water supply pipe comes into the building, and the plumber changes to copper just inside. The incoming water needs no main bond. But the copper branch goes back into the ground and comes back up, so that pipe is extraneous and needs bonding. The metal gas pipe is bonded as normal.
  • Plastic incoming pipe: no bond, because plastic is an insulator. That's true even if it changes to copper inside.
  • Copper that goes back into the ground and comes up again: bond it where it comes up.
  • Everything plastic (or no metal service comes from the ground): no main bonding at all.
  • Extraneous parts aren't always gas and water. Look for an oil supply pipe (rural properties without mains gas) and exposed structural steel that goes into the ground.
A bit of history
In the late '90s and early 2000s, anything copper-coloured got bonded. That's why you still see pipes cross-bonded together in airing cupboards, and bonds on baths, radiators and kitchen sinks. It's complete overkill. Now we bond once, within 600 mm of where the service comes in on the consumer's side, plus anywhere a pipe comes back up from the ground.

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside