Automatic disconnection of supply needs a path for fault current all the way back to the star point of the supply transformer. The dead tests proved every circuit reaches the MET. Ze — the external earth fault loop impedance — proves the MET reaches the source.

It’s impedance, not resistance, because it’s measured on the live AC supply: the transformer windings and the cable add reactance to the resistance. Still measured in ohms.

Most UK installations are TN (TN-S or TN-C-S), which this covers.

Guidance Note 3 · 2.6.14 · protection by automatic disconnection of supply

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside