Free notes
What the meter should read, and what to do with an unsatisfactory result0.54 megohms on new work. Pass?
Free from the notes: the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
What the meter should read
Find the table in Guidance Note 3 · p.70. The table gives the minimum. The number to actually work to is higher:
| Figure | What it is |
|---|---|
| 1 MΩ | The minimum in the table. A reading of 1 MΩ conforms. |
| 20 MΩ | What you should expect on a brand new installation. Anything less wants looking at. |
In practice a healthy new circuit reads at the top of the meter's range — >200 MΩ or >2000 MΩ depending on the instrument.
Unsatisfactory results, and what you do with them
Two worked judgement calls.
A continuity reading showing over-range
Meter shows "greater than" — off the top of the scale.
Check first: are the leads the right way round? Is the meter set correctly?
Is the switch operated, if it is a lighting circuit?
Then: that is an open circuit — a break in the conductor.
Action: installer pulls out and replaces that cable. Retest from the start.
Continuity wants as low a resistance as possible, so an over-range reading means there is no connection. The consolation: on a continuity failure you have not got far into the sequence, so retesting from the beginning costs you very little.
An insulation resistance reading of 0.54 MΩ
Minimum in the table = 1 MΩ -> 0.54 does not even conform
Expected on new work = >20 MΩ -> nowhere near
Verdict: not acceptable. Degraded or contaminated insulation,
or a load still connected.
Action: find the cause, put it right, retest.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing