Voltage drop in millivolts per amp per metreDoes 1.5 mm² pass volt drop at 37 metres?
Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
What it's for: checking there are enough volts left to push the current through the load. It's less about "how many volts are left at the end" and more about whether the push is enough. Drop too many volts and the load may not work as intended.
The limits: Table 4Ab
| Supplied from a public supply | Lighting (3%) | Other uses (5%) |
|---|---|---|
| Single-phase 230 V | 6.9 V | 11.5 V |
| Three-phase 400 V | 12 V | 20 V |
"Other uses" is the book's wording for any circuit that isn't lighting. The second row of Table 4Ab (installations supplied from a private supply) is very rarely used. You'll almost always use the first row, the public supply.
BS 7671 · Appendix 4 · Table 4Ab maximum voltage drop
The calculation
mV/A/m from the cable's B table · Ib in amps · L = length in metres · answer in volts
Why ÷ 1000? mV/A/m is millivolts per amp per metre. Without dividing by 1000, the answer comes out in millivolts. Dividing by 1000 turns it into volts, so you can compare it with Table 4Ab.
Worked example: the same circuit (made-up values)
Length 37 m · Ib 13.2 A (must be ≤ In of 16 A) · 1.5 mm² Table 4E1B: ignore the DC column use the single-phase AC column for reference methods A and B (in conduit or trunking) 1.5 mm² → 31 mV/A/m VD = (31 × 13.2 × 37) ÷ 1000 = 15 140.4 ÷ 1000 = 15.14 V Not lighting → max 5% = 11.5 V 15.14 V > 11.5 V ✗ → voltage drop exceeded → increase the CSA
BS 7671 · Table 4E1B · 90 °C thermosetting single-core, voltage drop (mV/A/m) · p.487
31 mV/A/m means that cable, installed that way, loses 31 millivolts for every amp, for every metre. You fix too much voltage drop by increasing the conductor size until the answer comes in under the limit. You never make the device bigger to fix it.
One more check: the largest mV/A/m that would pass
max mV/A/m = (max VD × 1000) ÷ (Ib × L)
= (11.5 × 1000) ÷ (13.2 × 37)
= 11 500 ÷ 488.4
= 23.55 mV/A/m
→ go down that Table 4E1B column to the first size at or below 23.55.In Appendix 4 there's a formula for Ct that looks complicated. You won't do it at Level 3, but here's the idea. Say volt drop pushes you from 1.5 mm² up to 2.5 mm². There's still only 13.2 A flowing, but in a bigger conductor, so it runs cooler. A bigger conductor gets rid of heat more easily. Stir a boiling pan with a teaspoon and it burns your fingers fast. A big dessert spoon takes much longer. Ct lets a Level 4 designer take account of that cooler running.
BS 7671 · Appendix 4 · Ct formula (Level 4 only) · p.457
Amps in a circuit? Power triangle, P ÷ V (√3 × VL for three-phase).
Cable size? Know the cable type, installation method, In and the correction factors. Decide which factors happen at the same time. Work out It = In ÷ factors. Find a table value at least that big.
Voltage drop? Use the B table that goes with your cable table, take the mV/A/m and do mV/A/m × Ib × L ÷ 1000.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing