Free notes
Undervoltage, coordination and monitoring — 535 to 538Why should only the nearest device trip?
Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
These are short sections. You don't learn them, you locate them — recognise the keyword in the question and flick straight there.
535 — protection against undervoltage
This is the device-selection end of 445, which you met in Part 4 earlier. The danger is what a drop or loss of voltage, and its return, can do: equipment restarting by itself when the voltage comes back, with someone's hands on it, or equipment being damaged by running on too low a voltage. The regulation is mostly framed around relays and motor circuits, but the principle applies to any circuit.
536 — coordination, also known as selectivity
Section 536 is headed coordination. Selectivity is the same idea under its other name, and it is defined in Part 2 (p.48). Know both words.
- Selectivity applies to overload conditions as well as short circuits and residual currents.
- You can have selectivity between fuses and breakers, and between overcurrent devices and RCDs.
- There is more than one way of achieving it, and the section lists options. 536.3 lists the requirements — that's the bit worth highlighting.
Don't confuse it with the problem from earlier: put too many circuits behind one 30 mA RCD and accumulated leakage trips it with no fault present. That isn't selectivity; it's a design and division-of-circuits problem (531.3.2: standing leakage no more than 30 % of IΔn).
538 — monitoring devices
This is where insulation monitoring devices (IMDs) for IT systems sit, alongside residual current monitoring. Don't muddle an IMD with an RCM — different job, different device.
535 · devices for protection against undervoltage 536 · coordination / selectivity ★ 536.3 · the list of requirements 538 · monitoring devices · IMDs for IT systems 445 · undervoltage (Part 4)
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing