The whole test sequence, in orderCan you write the test sequence cold?
Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
Worth copying out once from memory, then checking against Guidance Note 3 · Figure 2.12 · p.57 or On-Site Guide · section 10.
| # | Test | Instrument | On which conductors |
|---|---|---|---|
| DEAD | |||
| 1 | Safe isolation | GS38 approved voltage indicator | All combinations — see below |
| 2 | Continuity of protective conductors | Low-resistance ohmmeter | R2 on bonding, then R1+R2 on circuits |
| 3 | Continuity of ring final conductors | Low-resistance ohmmeter | L, N, CPC — three steps |
| 4 | Insulation resistance | Insulation resistance tester | Live conductors together to earth; between live conductors |
| — | Polarity (circuit) | proved by the continuity tests | |
| LIVE | |||
| 5 | Supply polarity | Approved voltage indicator | All combinations — now looking for voltage |
| 6 | Earth fault loop impedance Ze | Earth fault loop impedance tester | Line–earth at the origin |
| 7 | Zdb — at each distribution board | Earth fault loop impedance tester | Line–earth at the board |
| 8 | Zs — each circuit | Earth fault loop impedance tester | Line–CPC at each point |
| 9 | RCD operation | RCD tester or MFT | See below |
| 10 | Prospective fault current Ipf | Same instrument, PFC button | PEFC and PSCC — record the higher |
✋Know Guidance Note 3's grouping. These notes take checking the supply polarity as the first live test. Guidance Note 3 · Figure 2.12 · p.57 groups the live tests as earth electrode resistance, earth fault loop impedance and RCD operation, then prospective fault current, phase sequence, functional testing and voltage drop — and where there is an earth electrode, its resistance is measured before the installation is energised. Know which book you are answering from.
The earth electrode test moves. Guidance Note 3’s before-energising point fits E1, the dead test: it comes earlier, before supply polarity. Test method E3 needs the supply on, so on a TT system using E3 it sits with the live tests, which is where most people will meet it.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing