Our three-phase board is physically bigger than the 10-way single-phase board, but it's a 12-way, only two more ways. It can take 12 single-phase circuits, or three-phase circuits, or a mix.

TP main switch · 125 A BS EN 60947-3 (isolator only) L1 L2 L3 in L1L2L3 3-pole C20 one trips= all off L1L2L3L1L2L3L1L2L3 NE NE neutral bars linked behind earthing conductor → E bar left-sideCPCs right-sideCPCs
Redrawn three-phase busbar layout. Each way on each side picks up the next phase in turn (L1, L2, L3, L1…). A single-phase CB uses one way. A three-pole CB spans three ways, so it gets one of each phase.

Three-pole breakers

  • A three-pole circuit breaker is really three single-pole breakers joined together with a common bar through the handles. Ours is three Type C 20 A poles.
  • If any one phase has an overload, short circuit or earth fault, that pole trips and the common bar takes all three off.
  • Why that matters: old boards used BS 3036 rewireable fuses, one per phase. If L1 blew, only L1 went off. The machine would stop working, but it would still be live on L2 and L3. Three-pole breakers fixed that. You'll still come across rewireable boards on site.

Main switch and busbars

  • The triple-pole main switch is again a BS EN 60947-3 on-load isolator (you can just see the circles in its symbol), rated 125 A. On this board L1, L2 and L3 come in the top, and each pair of terminals is joined when it's on. Boards differ, so when you prove dead, test on the load (busbar) side of the main switch, whichever end that is on the board in front of you, or in the busbar chamber. It won't trip.
  • You can get four-pole switches that also switch the neutral. On our board the neutral goes straight to the neutral bar, not through the switch.
  • A pre-made busbar cover sits over the busbars, with a label so you can write which circuit does what.
  • Underneath are three busbars, L1, L2 and L3. A continuity tester proves which terminals are joined: it beeps between every L1 terminal, but not from L1 to L2 or L3.
  • Single-phase circuits (lighting needs only 230 V) use a single-pole CB on one way. The neutral goes to the corresponding neutral terminal.
  • Three-phase circuits (a machine or motor) use a three-pole CB across L1, L2 and L3, with the neutral (if needed) in the relevant terminal.
  • There are two neutral bars, one for each side, joined by a solid bar hidden behind. The same goes for the earth bars: CPCs from each side go on that side's bar, and the incoming earthing conductor lands on the earth bar. The main neutral makes a big, solid connection onto its bar.
No split-load version
You typically can't get split-load three-phase boards with RCDs built in like this one. If a circuit needs RCD protection (and plenty will), use an RCBO: fly lead to the neutral bar, circuit line and neutral into the RCBO, CPC to the earth bar.
That's true of the style of board shown here. Some manufacturers do make three-phase boards with a four-pole RCD incomer or RCD-protected sections, so check what's available before you design one in.

BS 3036 · semi-enclosed (rewireable) fuses BS EN 60947-3 · TP main switch (isolator)

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside