SPARKYSTUDY NOTES

Free notes

The sequence of testsWhere do the live tests start?

Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.

From Sparky’s full video lesson. Members get the whole lesson on every notes page.

The notes

Exactly as they are on the site.

Download these notesPDF · free to keep

Guidance Note 3, section 2.6 gives you the sequence of tests as a colour page (Figure 2.12, p.57).

Where the live tests start. Guidance Note 3's Figure 2.12 (p.57) starts its live tests with earth electrode resistance, where there is an electrode (measured before the installation is energised), then earth fault loop impedance and RCD operation. And polarity by continuity (each circuit, dead) is not the same thing as polarity of supply (live).
≡Even though GN3's page is headed initial verification, the tests run in the same order regardless. That order is what you're being examined on.
✋Section 10 of the On-Site Guide also carries the safe isolation procedure — arguably the best version in the set of books.

GN3 · 2.6 · Figure 2.12 · p.57 · sequence of tests ★ OSG · Section 10 · dead and live tests, and safe isolation ★

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside