Free notes
The Rn + R2 alternative: proving conductors are in the RIGHT placeWhen do you test Rn plus R2?
Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
Guidance Note 3 · p.59 · Figure 2.14. An alternative to test method 1 (R1 + R2), for protective conductors downstream of a control device that is open-circuit when power is removed — contactors, motion or day/night controls, timers, dimmers, smart switches, building management systems.
The neutral is not switched, so you link neutral to earth temporarily at the board and measure Rn + R2 at each point. It proves the cpc the same way, through the neutral instead of the line.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing