The test is the incoming service, at the meter or stop cock. Plastic in means the pipe is not introducing earth potential from outside, so it is not an extraneous conductive part, so there is nothing to bond. Metal in means it must be bonded, on the load side, within 600 mm of the meter.
| Incoming service | Main bonding? | Supplementary? |
|---|---|---|
| Plastic | No | No |
| Metallic | Yes — within 600 mm of the meter | Only if the conditions in Section 701 are not met |
If the pipework is buried or you cannot see where it enters, look at the meter or stop cock — the pipe arriving at that fitting is the one that decides it.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing