The long lead for continuity testingFifty metres of lead. What do you do with it first?

Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.

From Sparky’s full video lesson. Members get the whole lesson on every notes page.

The notes

Exactly as they are on the site.

Download these notesPDF · free to keep

Your ordinary leads are about a metre long. A wandering lead (long lead) is a dedicated test lead on a reel, often around 50 m, so you can reach from the board to the far end of a circuit or out to a gas meter.

  • Null it — all of it — or note its resistance and subtract it. Fifty metres of lead is a lot of resistance to leave in your answer.
  • Unwind only what you need. The rest is a trip hazard across somebody’s floor, and a lead on the floor gets trodden on and damaged.
You can make one. A length of single-core green-and-yellow on a reel does the same job.

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside