The global test
Instead of circuit by circuit, you can test a group of circuits at once: main switch off, the circuit breakers on, one probe on the outgoing side of the main switch or busbar, the other on the earth bar (then the neutral bar). Every circuit fed from it is tested in one go.
- It’s quicker. But the reading is all those circuits in parallel
- It means switching on RCBOs and AFDDs — and an AFDD RCBO costs well over a hundred pounds. Leave those circuits out and test them on their own.
Three phase, and the periodic
Three phase is ten tests at 500 V: each line to neutral, each line to earth, each pair of lines, and neutral to earth.
On a periodic you often don’t know what’s connected, and you can’t go through someone’s home looking behind every cupboard. One cautious approach some inspectors take is to test live conductors to earth only, at 250 V, and N/A the live–live column — with the reason written in the remarks. That only applies where the equipment can’t be disconnected (Reg 643.3.2); where it can, disconnect it and test as normal.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing