Safe isolation on a periodic, with the open-PEN checksWhy clamp the earthing conductor before you switch off?
Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
On a TN-C-S supply the PEN conductor can come loose from the star point. The circuits stop working, but they’re still live — and everything bonded to the MET can sit at a dangerous voltage: the board case, the pipes, the sink. So the isolation below checks for it before you trust anything is dead.
- Turn the loads off first, then the main switch. It’s rated to switch on load, but there’s no need to make it — and later you can bring circuits back one at a time.
- Ask before you switch anything off. It’s someone’s home.
Guidance Note 3 · Section 3 · safety in inspection and testing Guidance Note 3 · Appendix D · neutral current diversion
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing