Routine checks — and who does them
Guidance Note 3 · Section 3. Separate from the periodic itself, and the two get confused.
| Looking for |
|---|
| Breakages, wear, deterioration |
| Signs of overheating — discolouration, smell |
| Missing parts — covers, screws, blanks |
| Loose fixings |
| Switchgear accessible and not obstructed |
| Labelling present and legible |
| Operation of switchgear, and of test buttons |
The occupier or duty holder can do them, once they know what to look for. They are looking, not dismantling — which is the whole point of a routine check.
Sampling — when, and how much
Sampling means inspecting and testing a proportion of the installation rather than all of it, and drawing a conclusion from it. It is allowed, but it is conditional.
| Situation | What you do |
|---|---|
| Previous records available and credible | Sample a proportion of it |
| No previous records | Full inspection and test. Nothing to sample against |
| Sample results differ from what the records say | 100% of the installation is then tested |
| Records turn out to be wrong — wrong cable type, wrong method | Treat the rest with real caution; the records are no longer evidence |
Guidance Note 3 · Section 3 gives sample sizes and a flowchart for adjusting them.
What the sample is chosen on
Not at random. Guidance Note 3 · Section 3 sets out what to weigh.
| Factor | Why it matters |
|---|---|
| Age and condition | Older and harder-used parts are more likely to show something |
| Type and use of the installation | A production area is nothing like the offices on the same site, even on the same supply |
| Environment and temperature | Hot, wet, dusty or corrosive areas first |
| Work carried out since the last inspection | New work is where the new faults are |
| Time since the previous inspection | A lapsed interval raises the sample |
| Quality of the records | Poor records mean less can be assumed |
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing