A ring is tested in three steps, in order, and each step proves something the one before it could not. The drawing for step 2 is at Guidance Note 3 · p.64.

  1. Step 1 — end to end. Measure r1, rn and r2 separately, each conductor end to end, before anything is cross-connected. Both leads on one conductor each time.
  2. Step 2 — line to neutral. Cross-connect the legs and measure at every socket.
  3. Step 3 — line to cpc. Cross-connect the other way and measure again at every socket. This is the reading you record as R1 + R2.
Expected step 2 = (r1 + rn) ÷ 4  ·  expected step 3 = (r1 + r2) ÷ 4

Why divide by four? With the cross-connection made, the ring becomes one loop of resistance r1 + rn (or r1 + r2 at step 3). Wherever you plug in, you are measuring two halves of that loop in parallel: each half is (r1 + rn) ÷ 2, and two equal halves in parallel give half of that again — (r1 + rn) ÷ 4.

Worked example

r1 measured  = 0.3 Ω
rn           = 0.3 Ω   (same csa, same length, same cable)

Expected R1 + Rn = (0.3 + 0.3) ÷ 4
                  = 0.15 Ω
rn should match r1 within 0.05 Ω — line and neutral are the same size and the same length. That figure is in the On-Site Guide · 10.3.2 step 1 · p.127 (“within 0.05 Ω if the conductors are all of the same size”), not in Guidance Note 3 — and the On-Site Guide is not an exam book.
Cross-connecting in practice. Connector blocks, or thin crocodile test leads (about £10 a set). Whatever extra leads you use, they must be nulled like any other.
You do not record R1 + Rn. Step 2 is a check, not a recorded value — it is step 3 that goes on the schedule. If you want it on record, it can go in the remarks.
✋Step 2 alone is not enough to prove polarity. Step 1 only shows the conductors are present. Step 2 shows up a line or neutral swapped with the cpc at an outlet; a line and neutral swapped only shows itself at step 3. You need both.

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside