Free notes
Ring final circuits, step 1: end to endWhat should r1 and rn agree within?
Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
A ring final circuit gets its own three-step continuity procedure, and it takes longer than everything else on the board put together. Step 1 is three end-to-end tests.
| Test | Between |
|---|---|
| r1 | Line to line — the two legs of the ring |
| rn | Neutral to neutral |
| r2 | CPC to CPC |
Disconnect the two legs from the protective device, the neutral bar and the earth bar, and clip onto each pair — far quicker than probing. Your leads are already nulled from the last test, so long as you haven't changed function.
What the readings should look like
And r2, from the 1.67 ratio
2.5 mm² / 1.5 mm² twin & earth → ratio 1.67 r1 = 0.01 Ω Expected r2 = 0.01 × 1.67 = 0.017 Ω
GN3 · 2.6.6 · p.63 · ring final circuit continuity, step 1 ★ OSG · 10.3.2 · p.127 · ring final step 1 · the 0.05 Ω tolerance
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing