Proving dead: where the probes actually goTop or bottom of the main switch?
Free from the notes: the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
A favourite question. The rule is the same on every board: test on the load (busbar) side of the main switch, whichever end that is on the board in front of you, or in the busbar chamber.
| System | Where you test | Why |
|---|---|---|
| Single phase | Load (busbar) side of the main switch — usually the bottom on a consumer unit, where the supply lands on top | The busbar links all the breakers and RCDs, so the load side of the main switch proves every circuit |
| Three phase | Load (busbar) side of the main switch, or the busbar chamber | Which end the supply comes in varies between boards, so find the busbar side on the board in front of you |
On larger three-phase installations there may be an open busbar chamber above the board carrying the line conductors. That gets safely isolated too.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing