Free notes
Phase rotationL1 to L3, or L3 to L1?
Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.
The question at the end: L1 to L3, or L3 to L1? The answer is in the notes below.
The notes
Exactly as they are on the site.
Guidance Note 3 · 2.6.17 · p.93 for the phase sequence test — highlight it — and 4.8 · p.140 for phase rotation instruments. It is a live test, because it needs a live three-phase board.
What it is, in one line: a polarity check for a three-phase supply. It proves the phases arrive in the right order.
| Display | Meaning |
|---|---|
| Arrow to the right | Correct — phases in sequence |
| Arrow to the left, or L lights up | Reverse — something is in the wrong place |
The test sequence — and it has to be this way round
L1 to L2 then L2 to L3 then L3 to L1 That last one is L3 to L1, not L1 to L3. Your hands cross over to do it. You are drawing a clockwise circle.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing