Periodic testing, and knowing when to stopThe ring's line reads over 1999 ohms. Do you carry on?
Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
Two calls that are particular to a periodic:
- Don’t test a circuit inspection has already failed for a rewire. A ring in 1.5 mm² throughout, or insulation crumbling off the conductors, is a C2 already. Testing it tells you nothing more.
- Insulation resistance with unknown equipment connected:
Then the ring final, step 1, end to end:
- Record what you got: >1999, 0.03, 0.06.
- Rule a line through the rest of that circuit’s row.
- Remarks: testing stopped after C2 found on r1.
- Observations: ring final circuit, line conductor open circuit — C2.
Steps 2 and 3 would be pointless. The ring has failed. Good inspectors know when to stop.
Can’t read a device’s Icn because it’s printed on the side? Don’t dismantle a live board to write a number down. Record it as not verified and say why.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification