Free notes
Inspection precedes testing, and defects are corrected firstWhen must a defect be put right?
Free from the notes: the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
Inspection precedes testing
And the part of the installation being inspected must be disconnected from the supply while you do it.
You also need to know what you are checking against: the inspector must have adequate information about the design — what the designer specified.
| Page | What you are verifying |
|---|---|
| GN3 · p.21 | The fixed installation is correctly selected and erected, taking account of manufacturers' instructions |
| GN3 · p.22 | The fixed installation is not physically damaged, and is ready for use as planned |
Defects: correct them before you test
Any defect or non-conformity — with Guidance Note 3, with BS 7671, or with the manufacturer's instructions — is corrected prior to testing.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing