Four things before you press test on insulation resistanceWhat has to be done before you press test?

Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.

From Sparky’s full video lesson. Members get the whole lesson on every notes page.

The notes

Exactly as they are on the site.

Download these notesPDF · free to keep
  1. Protective conductors connected. Check the main bonding is on: each bond was reconnected straight after its continuity test, and after the diverted-neutral checks. The test needs the installation connected to earth.
  2. Pilot and indicator lamps, and capacitors, disconnected — they give a false, low reading (section 4).
  3. Voltage-sensitive equipment disconnected — dimmers, touch switches, electronics. 500 V can damage them.
  4. The neutral isolated from earth — with the main switch off, the incoming neutral (which is joined to earth at the source, and on TN-C-S in the supply) is out of the test.

Then: unplug everything on socket circuits, remove the lamps on lighting circuits, and put the covers back on. You’re about to put 500 V on the circuit, and fingers can find exposed terminals.

GS38 matters again here. This is the first test with a test voltage well above 50 V. Proper probes: finger guards, 2–4 mm tips.

Guidance Note 3 · 2.6.7 · the checks before the test

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside