Download these notesPDF · free to keep

This is the general characteristics — what an inspector has to know before inspecting anything. Most of it is ticks.

BoxWhat goes in it
Earthing arrangementTN-C, TN-S, TN-C-S (PME), TN-C-S (PNB), TT or IT. On the A4 form, TN-C-S is split into PME and PNB
Live conductorsAC or DC, then the wires. Single phase is 1-phase, 2-wire (line and neutral both count). Three phase with a neutral is 3-phase, 4-wire
Nominal voltage, frequency230 V (or 400/230 V three phase) and 50 Hz. These are by enquiry
Prospective fault current, ZeBy enquiry or measurement. Both are live tests — leave them empty until you’ve done them
Supply protective deviceThe DNO’s cut-out fuse, read off the front: e.g. BS 1361, Type II, 100 A
Means of earthingThe distributor’s facility, or an installation earth electrode (with its type, location and resistance)
Maximum demandSee below
Earthing conductorMaterial and size, e.g. copper 16 mm². A tick for “connection / continuity verified” comes later
Main protective bondingMaterial and size, e.g. copper 10 mm², and what it bonds: water, gas, oil, structural steel, lightning protection, other
Main switchLocation, BS (EN) number, number of poles, current rating, voltage rating
✋The cut-out isn’t yours. If the type or rating can’t be read, don’t open it. The DNO is required to make the supply characteristics available under the ESQCR, so ask them.

Maximum demand isn’t the main fuse

It’s tempting to write the cut-out rating (“it’s a 100 A fuse, so 100 A”) or the main switch rating. Guidance Note 3 says what it actually is: the maximum demand expressed in amps, kW or kVA, after diversity is taken into account. The form says “kVA / A”, so delete whichever you’re not using. The fuse rating already has its own box.

The main switch: isolator or circuit-breaker?

A domestic main switch is normally BS EN 60947-3: a switch-disconnector. The 100 A on the front is what it can switch on load. It doesn’t protect anything. So the form’s “if overcurrent protective device” block is N/A, and so is the “if RCD main switch” block, unless the main switch really is an RCD. A main switch to BS EN 60947-2 is a circuit-breaker, and then its rating and breaking capacity go in that block. Two poles on single phase (line and neutral), more on three phase.

Boxes you leave empty for now

Box on page 2Filled in after
Main bonding: continuity verifiedTesting continuity of the main bonding
Confirmation of supply polarityThe live supply polarity check
Prospective fault current · ZeThe live tests at the origin
Earthing conductor: continuity verifiedA sensible Ze, taken with your lead on the earthing conductor itself, shows the earth path is continuous all the way back to the source

Guidance Note 3 · 2.3 · required information, max demand Guidance Note 3 · Fig 5.2 · p.148 · an example page 2 BS EN 60947-3 · the main switch

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside