Free notes
Earthing systems: TN-C-S, TN-S, TTTN-C-S, TN-S, TT. What do the letters mean?
Free from the notes: the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
Reading the letters: T = Terra (earth) · N = Neutral · C = Combined · S = Separate.
| System | How the earth is provided | Expected max Ze | Where you'll find it |
|---|---|---|---|
| TN-C-S also called PME | Neutral and earth are combined in the supply cable (PEN conductor), then separated at the cut-out. PME = protective multiple earthing, with many earth connections along the network. Provided by the DNO. | 0.35 Ω | Most new builds and most homes today |
| TN-S | Earth and neutral are separate all the way. The earth is the metal sheath or armour of the supply cable, clamped and taken to the MET. Provided by the DNO. | 0.8 Ω | Older properties |
| TT | No earth from the DNO. The installation has its own earth electrode (rod or plate) in the ground. The client pays for it, and you install it. | up to 200 Ω | Rural areas, farms, caravan parks and other places too far from a transformer's star point |
Electrician's Guide to the Building Regs · Supply systems: expected maximum Ze values (TN-C-S 0.35 Ω, TN-S 0.8 Ω) · p.53 Electrician's Guide to the Building Regs · Figure: cable sheath earth (TN-S), earthing and main bonding · p.55 On-Site Guide · List of earth electrode types (rods, plates, etc.) for TT
The earth fault path
Suppose a line conductor comes loose and touches the metal case of a load. The fault current travels through the case, along the CPC to the MET, down the earthing conductor, back through the supply to the transformer star point, and round to the protective device, which trips. This is automatic disconnection of supply (ADS).
Because the neutral and earth are combined in the supply cable, damage to that PEN conductor (a nick or a cut) means more than losing your earth: all the earthed and bonded metalwork in the installation can rise towards line voltage. On TN-S, a problem with the sheath earth only affects that one property, so it's easier to spot. On your own circuits, you can use the armour of SWA cable as the CPC.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing