This is one of the most important things about metal conduit. Because it's made of metal and contains live conductors, it's an exposed-conductive-part: a conductive part that isn't normally live but can become live under fault conditions. Nothing stops a damaged conductor touching the inside of the conduit and making the whole run live.
The whole metal conduit system must be connected to the MET (main earthing terminal), through a protective conductor, because it's an exposed-conductive-part.
- Some installers draw in only line and neutral and use the metal conduit itself as the CPC. That's allowed.
- If you do, then at initial verification (testing a new installation) you must verify the continuity from the MET all the way along the conduit, at the various points (boxes and entries).
BS 7671 · Section 543 · types of protective conductor (metal conduit is one allowed type)
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing