SPARKY STUDY NOTES sparkystudynotes.co.uk/learn/disconnection-times-putting-it-all-together
Free notes
Disconnection times: putting it all togetherDisconnection times, in a minute.
Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.
The notes
Exactly as they are on the site.
Sparky's advice
This can feel overwhelming, but it's not meant to be. Rewatch it two or three times, then draw your own installation like ours, with different circuits, and work out which table or regulation each one falls under and what its time is. This topic gets a lot of questions, so it's an important area.
This can feel overwhelming, but it's not meant to be. Rewatch it two or three times, then draw your own installation like ours, with different circuits, and work out which table or regulation each one falls under and what its time is. This topic gets a lot of questions, so it's an important area.
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing