SPARKYSTUDY NOTES

Free notes

Continuity method 2 on a periodic you can't switch offThe client says the power stays on. Can you still test the CPCs?

Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.

From Sparky’s full video lesson. Members get the whole lesson on every notes page.

The question at the end: The client says the power stays on. Can you still test the CPCs? The answer is in the notes below.

The notes

Exactly as they are on the site.

Download these notesPDF · free to keep

On a periodic, the client may say the power can’t go off — a perfectly reasonable limitation, and one you write down. Method 1 needs the circuit dead. Method 2 doesn’t.

  • Don’t disconnect any protective or bonding conductor on a live installation. Clip the long lead to the MET instead.
  • Touch the other lead on each exposed-conductive-part: metal switch plates, metal-clad sockets, luminaire casings.
✋The reading includes parallel paths when nothing is disconnected. It proves there is an earth path to each accessory; it doesn’t prove that circuit’s own CPC alone.

Guidance Note 3 · 3.10.3 · testing where the circuit can’t be isolated · p.128

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside