Continuity of protective conductors, including main and supplementary bonding, can be tested two ways. Do them in either order; in the assessment both count as the first test in the sequence.
Test method 1 needs a line conductor: you link line and CPC at the board and test across them at each point. Bonding has no line conductor. So for the bonding there is only one method: test method 2.
Guidance Note 3 · 2.6.5 · test methods 1 and 2
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing