The last chapter of Part 4, and the end of this lesson's ground. Four kinds of isolation and switching, and the exam wants you to tell them apart.
| Section | Type | What it's for | On every circuit? |
|---|---|---|---|
| 462 | Isolation | Making dead for work — the big red-and-yellow rotary switch on a machine, or the main switch | Every circuit must be capable of isolation, but not by its own separate isolator (a circuit breaker suitable for isolation does it) |
| 463 | Functional switching | Turning the thing on and off in normal use | Yes |
| 464 | Switching off for mechanical maintenance | Stopping moving parts safely | Where needed |
| 465 | Emergency switching | Cutting the supply quickly to remove an unexpected danger | Where needed |
So the answer to "what is required for all single-phase equipment which requires separate control by the user?" is a functional switch. Work the options out by elimination:
- Double pole? No — ordinary circuit breakers are single pole and that's allowed.
- Isolator? No — you don't have a rotary isolator on every circuit in a house.
- Contactor? No — same reasoning.
- Functional switch? Yes. A light switch is one. A switched socket is one. A cooker switch is one. And that unswitched socket behind the washing machine is controlled by the switched fused connection unit above the worktop — which is its functional switch.
462 — the main switch in a dwelling
A typical Part 4 question: requirements for a main switch in a dwelling on a single-phase supply, operated by an ordinary person.
Remember the person definitions from Appendix 5 here: ordinary person is the householder, BA4 instructed is someone working under a skilled person's instruction, BA5 skilled is a qualified electrician. The question hinged on that single phrase.
Chapter 46 · isolation and switching (Chapter 45 withdrawn) 462 · isolation · main switch, both live conductors, on load 463.1.1 · functional switching for each part controlled independently
Free section from Sparky Study Notes. The full Level 3 notes, 1,463 practice questions and the video lessons: sparkystudynotes.co.uk
Test yourself on it
The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.
Get new notes and exam tips from Sparky
About one email a fortnight. Unsubscribe any time. Privacy noticeThat was one section. There are 583.
Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.
- 583sections of written notes
- 35video lessons
- 1,463practice questions
- 146diagrams, redrawn
- 18th Edition
- Building Regs
- PAT
- Fundamental Inspection & Testing
- Initial Verification
- Periodic Inspection & Testing