SPARKYSTUDY NOTES

Free notes

Cable types and marks of conformityGrey or white twin and earth. Does it matter?

Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.

From Sparky’s full video lesson. Members get the whole lesson on every notes page.

The question at the end: Grey or white twin and earth. Does it matter? The answer is in the notes below.

The notes

Exactly as they are on the site.

Download these notesPDF · free to keep
CableWhat it is / where it's used
Single coreOne insulated conductor, e.g. a 10 mm² green/yellow bonding conductor or a 16 mm² earthing conductor. "Single core" means one cable, not one strand.
Twin and earth (T&E)
flat, multicore, PVC/PVC, 70 °C
The standard domestic cable. 6242Y has a grey sheath. 6242B has a white sheath and is low smoke zero halogen (LSZH / LSF): less, lighter smoke in a fire, but harder to strip. Grey has a chalky powder inside so it strips easily, which is why most sparks prefer it.
FlexFlexible cable with many fine strands, for appliances and pendants
MICCMineral insulated copper clad: copper sheath with magnesium oxide powder inside. Very tough and expensive, but moisture from sweaty hands or breath on the ends ruins it. White sheath = emergency lighting (e.g. listed buildings, schools, churches). Red sheath = fire alarms.
SWASteel wire armoured, with 3, 4 or 5 cores. Used commercially and industrially, and for outside sockets, lights and outbuildings. The armour can be used as the CPC. It's not the same as the DNO supply cable.

Marks of conformity show a product meets the required standards:

  • CE is the EU mark.
  • After Brexit, UKCA is used in Great Britain and UKNI in Northern Ireland.
  • You'll also see BASEC (cables), ENEC, BEAB and the Kitemark.

Electrician's Guide to the Building Regs · 2.2.2 Conformance to equipment standards: UKCA / UKNI marks · p.35

Messy doesn't mean non-compliant
A common sight: T&E draped loosely across loft joists with a single clip. It's ugly and poor workmanship, but it isn't against the rules, because it's clipped direct. A better job would drill through the joists (following Part A) or clip at every joist.

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside