SPARKYSTUDY NOTES

Free notes

C2, and the test that separates it from C1Cable sheath stops outside the board. What code?

Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.

From Sparky’s full video lesson. Members get the whole lesson on every notes page.

The notes

Exactly as they are on the site.

Download these notesPDF · free to keep

One question does most of the work:

Is it dangerous now, under normal conditions — or only dangerous if a fault occurs?
C1 — danger presentC2 — potentially dangerous
When is it dangerousRight now, in normal useOnly when a fault occurs
TypicalAccess to live partsProtective measures missing or ineffective
ExamplesMissing blanks, exposed busbar, broken accessory with conductors reachable, reverse polarity at the originMissing earthing conductor, missing CPC at a point, main bonding missing
Why a missing earthing conductor is a C2 and not a C1. Under normal operation the earthing system does nothing at all — the installation works and is safe. It only becomes dangerous the moment there is an earth fault. Dangerous-when-faulted is the definition of C2.
✋The general rule for earthing and bonding defects: C2. Anything wrong with the earthing conductor or main protective bonding is C2 — unless a serious fault has actually been detected on the system, which changes the picture. Bonding that is in place but connected to branch pipework is coded differently in the guide: see number 2 in the scenarios.
Is it dangerous RIGHT NOW? yes no — only on a fault C1 — danger present access to live parts exposed busbar, missing blanks, reverse polarity at the origin C2 — potentially dangerous a protective measure is missing no cpc at a point, no earthing conductor, main bonding missing
Under normal conditions nobody is hurt by a C2 — the danger needs a fault to appear first. That one distinction decides most coding questions.

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside