Approved Documents A, B, C, E, F, L, MHow deep can you chase a wall?

Free from the notes: Sparky’s video on it, the section word for word as members see it, and a PDF to keep.

From Sparky’s full video lesson. Members get the whole lesson on every notes page.

The notes

Exactly as they are on the site.

Download these notesPDF · free to keep

Worth doing: writing your own summary of every Approved Document. It's good exam prep.

A: Structure (notches, holes and chases)

Joists (side view) notch zone: 0.07–0.25 × span hole zone: 0.25–0.4 × span Notch on top: max depth 0.125 × joist depth Hole on centre line: max Ø 0.25 × joist depth Holes at least 3 diameters apart. Chases in walls wall (plan) Vertical chase ≤ ⅓ wall thickness Horizontal chase ≤ ⅙ wall thickness Cavity wall: measure the leaf, not both leaves.

Electrician's Guide to the Building Regs · 10.1.1 Notches and holes in joists (table and figure) · p.166 Electrician's Guide to the Building Regs · 10.1.2 Chases in walls · p.167 On-Site Guide · 7.3.1 cables through joists at least 50 mm from the top or bottom (or protected, 522.6.204) · p.102 On-Site Guide · Figure 7.3.1 Cables through joists · p.103 On-Site Guide · 7.3.2 and Table 7.3.2 cables in walls · p.104

B: Fire safety

Fire barriers where cables pass through walls and floors, and smoke and heat alarm positions (including loft conversions). Smoke and heat alarm questions do come up in the Building Regs exam.

Electrician's Guide to the Building Regs · Part B, fire safety and smoke/heat alarms · from p.168

C · E · F · L

  • C: site preparation and resistance to contaminants and moisture. Stop gas and water getting in where cables enter.
  • E: resistance to the passage of sound. Cables running through sound insulation have a reduced current-carrying capacity. Take care with recessed downlights in ceilings that contain sound insulation.
  • F: ventilation.
  • L1: conservation of fuel and power in dwellings. Energy-efficient lighting and automatic control of outside lights.

M: Access to and use of buildings

finished floor level (FFL): on top of the carpet, tiles or lino accessible band for switches and sockets switch (top) socket (bottom) 1200 mm 450 mm
Wall switches and sockets go between 450 mm and 1200 mm above finished floor level: the bottom of the socket at 450 mm or higher, the top of the switch or doorbell at 1200 mm or lower. This mainly applies to new builds.
  • When rewiring or altering an existing circuit, you don't have to meet Part M. The finished installation just has to be no less accessible than it was before.
  • When refurbishing or rewiring, it's fine to mount switches and sockets in keeping with the existing property.

Electrician's Guide to the Building Regs · Approved Document M: switch and socket heights figure · p.186 Highlight or tab this image

P: Permitted cable routes

Cables hidden in walls must run in the permitted zones: horizontally or vertically in line with an accessory, or near the wall's edges and corners. If a cable runs outside the zones, e.g. diagonally between two outlets, and is less than 50 mm deep, it needs an earthed metal covering, earthed conduit or trunking, or mechanical protection against nails and screws. RCD protection is not a substitute for the zones. Capping over cables in a chase is common, but it's extra mechanical protection rather than a requirement.

Electrician's Guide to the Building Regs · Permitted cable routes / zones figure (blue = OK, orange = needs extra protection) · p.43 On-Site Guide · Similar permitted-zones figure

Test yourself on it

The tests are in the members’ area. Get one wrong and it shows you why, and where to revise.

Get access

Get new notes and exam tips from Sparky

About one email a fortnight. Unsubscribe any time. Privacy notice

That was one section. There are 583.

Sparky Study Notes is the whole Level 3 syllabus written up like this: the explanation, the worked example, and where it is in your book. With a video lesson for every part and a practice paper for every exam.

  • 583sections of written notes
  • 35video lessons
  • 1,463practice questions
  • 146diagrams, redrawn
  • 18th Edition
  • Building Regs
  • PAT
  • Fundamental Inspection & Testing
  • Initial Verification
  • Periodic Inspection & Testing
Get access — £100 12 months. One payment. See what’s inside